WELCOME TO
KRAFT ENGINEERING & SURVEYING, INC.
(KE&S)

create your own web page

MR. DAVID J. KENNEY, P.S.

OVERVIEW

Mr. Kenney has over 26 years as a Professional Surveyor and 40 years of experience as a Survey Department Manager and Survey Crew Chief performing pre-engineering design surveys, remonumentation, land surveying, and construction staking for roads, bridges, subdivisions, condominiums, site developments and utility projects, utilizing Total Station and GPS instrumentation.

REPRESENTATIVE SELECTED PROJECTS 
GOVERNMENT CORNER SURVEYS 

Genesee County Section Corner Government Corner Surveys   Remonumentation, 1995-2018 

Consulting Surveyor to research, establish, and remonument over 350 section corners in Genesee County using GPS and Total Station Equipment.  

HIGHWAYS AND STREETS 

Hill Road Rehabilitation (2018)
Fenton Road to Dort Highway 
Grand Blanc Township 
Client: Genesee County Road Commission 

Design surveys for rehabilitation of 1.96 miles of concrete pavement with integral concrete curb and gutter, including intersection improvements, driveway approach repairs, drainage improvements, drainage structure repairs, utility structure repairs and adjustments, and permanent pavement markings and signing. 

Fenton Road Rehabilitation (2018)
Grand Blanc Road to Embrey Road
Grand Blanc Township 
Client: Genesee County Road Commission 

Performed Design Surveys for rehabilitation of 1.0 miles of two-four lane asphalt pavement including HMA pavement removal and replacement, HMA resurfacing, concrete curb & gutter repairs, grading and ditching, intersection improvements, driveway approach repairs; driveway culvert and road cross culvert removal and replacement, drainage structure repairs; and permanent signing and pavement markings. 

Linden Road Rehabilitation (2016 - 2017)
Lennon Road to Calkins Road 
Flint Township 
Client: Genesee County Road Commission 

Performed Design Surveys for rehabilitation of 1.97 miles of five thru seven lanes of concrete pavement with integral concrete curb and gutter, including intersection improvements, driveway approach repairs, drainage improvements, drainage structure repairs, utility structure repairs and adjustments, and permanent pavement markings and signing. 

Gale Road Rehabilitation (2016 - 2017)
McCandlish Road to Hegel Road 
Atlas Township
Client: Genesee County Road Commission 

Design surveys for rehabilitation of 0.57 miles of two-four lane asphalt pavement including HMA pavement removal and replacement, HMA resurfacing, concrete curb & gutter repairs, grading and ditching, intersection improvements, driveway approach repairs; driveway culvert and road cross culvert removal and replacement, drainage structure repairs; and permanent signing and pavement markings. The project also included the delineation of over 1,300 feet of existing wetlands on both sides of Gale Road.

Irish Road & Potter Road Intersection Improvements (2015-2016)
Davison and Richfield Townships, Genesee County, MI
Client: Genesee County Road Commission 

Design surveys for intersection widening project from two lanes to four and five lanes to provide new left and right turn lanes with thru lane; pavement resurfacing and reconstruction (HMA Base Crushing and Shaping, and/or new Aggregate Base and HMA Surfacing); including drainage improvements; driveway approach improvements; utility manhole adjustments; water meter vault relocation; traffic control measures, and permanent pavement markings and signing. Prepared and/or obtained four (4) grading permits and two (2) right-of-way parcels.

Pierson Road Rehabilitation (2015)
Linden Road to I-75 Freeway
Mt. Morris Township, Genesee County, MI
Client: Genesee County Road Commission 

Design surveys for concrete pavement rehabilitation and reconstruction (milling and/or new aggregate base, and HMA surfacing) of 1/2 mile of 5 to 6 lane concrete and asphalt over concrete primary road, including drainage improvements, intersection and driveway approach improvements, curb and gutter and sidewalk repairs; sidewalk ramps; utility manhole adjustments; traffic control measures, and permanent pavement markings and signing. The project also involved the acquisition of nine (9) grading permits and two (2) right-of-way parcels.

 Lapeer Road Rehabilitation (2015) 
Belsay Road to Vassar Road 
City of Burton, Genesee County, MI 
Client: City of Burton   

Design surveys for rehabilitation (milling, new aggregate and/or rubblized concrete base, and HMA surfacing) of one mile of two (2) lane asphalt and asphalt over concrete primary road, including drainage improvements, intersection and driveway approach improvements, curb and gutter and sidewalk repairs, utility manhole adjustments, traffic control measures, and permanent pavement markings and signing.

McCaslin Lake Road Rehabilitation (2014)
Silver Lake Road to Finch Drive 
Culvert Replacement and Bridge Deck  
Resurfacing Over Shiawassee River 
Davison Township, Genesee County, MI 
Client: Genesee County Road Commission 

Design surveys for rehabilitation of a two lane asphalt road, including approach construction; ditching; driveway approach and culvert improvements; new guardrail; bridge rail retrofit channel modifications; heavy riprap slope protection; traffic control measures; and permanent pavement markings and signing.

South Saginaw Road Rehabilitation (2014)
Hill Road to Maple Avenue 
Grand Blanc Township, Genesee County, MI 
Owner: Genesee County Road Commission  

Design surveys for rehabilitation of one and one-third miles of 5 to 6 lane asphalt and asphalt over concrete primary road, including drainage improvements, intersection and driveway approach improvements, curb and gutter and sidewalk repairs, utility manhole adjustments, and permanent pavement markings and signing.  

Bristol Road Rehabilitation (2013)
Van Slyke Road to Fenton Road 
Flint Township, Genesee County, MI 
Owner: Genesee County Road Commission  

Design surveys for rehabilitation of one mile of 5 to 6 lane asphalt and asphalt over concrete primary road, including drainage improvements, intersection and driveway approach improvements, curb and gutter and sidewalk repairs, utility manhole adjustments, and permanent pavement markings and signing.

BRIDGES AND CULVERTS

Chicago Road Culvert Replacement at Root Drain (2012) 
Mt. Morris Township, Genesee County, MI 
Owner: Genesee County Road Commission 

Design surveys for construction of a new concrete box culvert, including approach construction, ditching, driveway approach and culvert improvements, new guardrail, channel modifications, heavy riprap slope protection, traffic control measures, and permanent signing. Performed hydraulic analysis. Obtained MDEQ permit.

Culvert Replacement Program (2011) 
Contract No. 3, Genesee County, MI 
Owner: Genesee County Road Commission 

Design surveys for five separate large culvert replacement projects (four concrete box culverts and one 60” CSP culvert), including approach construction, ditching, driveway approach and culvert improvements, new guardrail, channel modifications, heavy riprap slope protection, traffic control measures, and permanent pavement markings and signing. Performed HY-8 hydraulic analysis. Obtained five separate MDEQ permits.

Maple Avenue over Thread Creek (2011) 
Bridge Replacement, City of Burton, Genesee County 

Design surveys for a two lane bridge replacement project, including structure surveys, roadway approach surveys, and hydraulic/watercourse surveys, topographic survey and mapping, alignment determination, utility location, and government section corner location. Also provided construction staking for all proposed bridge and roadway approach improvements. 


Contact Us


Questions, Requests or Feedback?

Please fill out the short form and a
representative of KE&S will contact you shortly.

Thank you for considering KE&S.